| |
| |
| |
| |
| |
| |
Remember
purchasing from us you can call a
Registered
Master Plumber anytime with your questions.
This diagram
will give you a basic understanding of the installation setup.
You will
need a GFI breaker for the electric
You will
need a water supply run into the room
You will
need a 3/4" outlet pipe of PVC leaving the pump to flush
UP at least 4 feet tall. If you want
a shower or tub you will need to build a platform
for those (gravity fed into the macerator). Toilet sits
on the ground with no platform and macerator box can be put behind the wall with an optional
fitting or behind the toilet standard.